QUESTION 75
A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.
What should the consultant do to verify that Foundation has completed successfully?

 
 
 
 

QUESTION 76
An administrator is planning to deploy a Nutanix cluster to support a few high-performance VMs. This deployment will have the followingconsiderations:
* Individual VMs will likely generate network throughputs in the range of 90-100Mbps
* Due to the configuration of the VMs, it is unlikely that a node will host more than one or two of them at a time
* Individual VMs will communicatewith only a few (one or two) remote hosts at a time
* Multicast will not be used in the environment
* The hosts are connected via two 1GbE network connections
How should the administrator configure the network bonds to meet this requirement while maintaining the simplest switch configuration?

 
 
 
 

QUESTION 77
A customer wants to run SAP HANA on a Nutanix cluster with the following characteristics:
* AHV nodes
* SAP HANA version 2
* Production database files
Which configuration should be recommended to the customer?

 
 
 
 

QUESTION 78
A consultant is setting up a new vSphere cluster. Customer requirements are as follows:
* VMs should automatically failover to another host if the host crashes
* Host CPU and Memory resources should be evenly balanced
* New VMs should be placed on the host with the most resources available Which two settings should be turned on to meet the requirements? (Choose two.)

 
 
 
 

QUESTION 79
A VM is exhibiting one or more of the following baseline values based on the past 30 days:
* CPU usage < 20%
* CPU ready time < 5%
* Memory usage < 50% (moderately) or < 20% (severely)
* Memory swap rate = 0 Kbps
Which type of VM is being described?

 
 
 
 

QUESTION 80
An existing Nutanix customer has several clusters in production and is adding a new cluster. The customer wants to create an AHV cluster that has already been racked and powered on remotely, with the factory image, using Prism Central.
Which step should the consultant take next?

 
 
 
 

QUESTION 81
A consultant needs to review a customer’s switch port configuration to identify any issues. Other customer requirements are as follows:
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?

 
 
 
 

QUESTION 82
A customer has a Nutanix cluster with 10Gb connectivity via switch fabric extenders. The administrator receives NCC health check errors of latency greater than 200ms.
Which action should the administrator take to resolve the NCC errors?

 
 
 
 

QUESTION 83
A CEO asks the IT administrator to provide a list of required resources to protect current workloads and the two new SQL servers from a disaster. The Nutanix environment is managed by Prism Central.
Which option explains how to meet the CEO’s request?

 
 
 
 

QUESTION 84
An administrator is responsible for the following Nutanix Enterprise Cloud environment:
* A central datacenter with a 20-node cluster with 1.5PB of storage
* Five remote sites each with a 4-node cluster with 200TB storage
The remote sites are connected to the datacenter via 1GB links with an average latency of 6 ms RTT. What is the minimum RPO the administrator can achieve for this environment?

 
 
 
 

QUESTION 85
Refer to the exhibit.

A Nutanix host is connected as shown in the exhibit with br0-up set to active/backup. Physical Switch 1 experiences a power outage causing br0-up to failover to using eth2. The CVM and host become inaccessible.
User VMs restart on other hosts in the cluster, which causes a disruption to those VMs.
Which configuration issue likely caused this outage?

 
 
 
 

QUESTION 86
A customer has an ESXi Cluster with two 10GbE NICs on each node with the following requirements:
* Solution must follow Nutanix Best Practices
* Network configuration should be redundant
* A vSphere Standard Switch must be utilized
Which load balancing method should be used?

 
 
 
 

QUESTION 87
During the Foundation imaging process, nodes are successfully imaged, but the cluster creation fails.
Which log should the consultant review to determine the cause?

 
 
 
 

QUESTION 88
Where can a consultant find Nutanix Enablement Starter Packs (ESPs)?

 
 
 
 

QUESTION 89
Refer to the exhibit.

A system administrator is using Range-Autofill tool to assign IP addresses to setup a multi-block cluster based on the following configuration:

Which additional changes must be made during the Foundation process to configure the cluster correctly?

 
 
 
 

QUESTION 90
A consultant successfully installs the Foundation VM on a laptop and needs to ensure the VM can communicate externally.
Which two configuration changes should the consultant make next? (Choose two.)

 
 
 
 

NCS-Core Question Bank: Free PDF Download Recently Updated Questions: https://www.practicematerial.com/NCS-Core-exam-materials.html

Related Links: myportal.utt.edu.tt startupxplore.com app.parler.com ehoroskop.net myportal.utt.edu.tt fortunetelleroracle.com

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below