Q14. Which temperature coefficient is used in the calculation to verify energy production of a PV system?
A)

B)

C)

D)

 
 
 
 

Q15. The AHJ for enforcement of the NEC has which responsibility?

 
 
 
 

Q16. When installing an ungrounded PV system with an open-circuit voltage of 450Vdc and a maximum voltage of
3000Vdc which procedures should be followed to establish an electrically safe condition?

 
 
 
 

Q17. An installer was asked to provide a means to measure the voltage of each battery in a system. The bank is located 50 ft.
From the data logger. The installer will be using shielded. Twisted pairs of instrumentation wiring, all run in the bundle a conduct.
The signals are connected to isolated and ungrounded inputs at a data logger. Which safely precaution is MOST needed to protect the instrumentation wiring?

 
 
 
 

Q18. According to the NEC, where on a residential PV system MUST the labeling describing the type of rapid shutdown be located?

 
 
 
 

Q19. An installer is using 1/2 in lag boits to secure roof-monitoring hardware to rafters through a roof deck. Which of the following should the installer predrill?

 
 
 
 

Q20. A ground resistance measurement on a newly installed grounding electrode indicates a resistance of 130. The earth connection may be improved by connecting the existing electrode to a:

 
 
 
 

Q21. How should stratification be eliminated in a set of large, stationary, stationary flooded lead-acid batteries?

 
 
 
 

Q22. Aerial lifts used to hoist equipment and PV modules to roof levels may be fieldmodifiedfor uses other than those intended by the manufacturer with which approval or certification?

 
 
 
 

Q23. A bank of batteries with capability of supplying 250A and a maximum voltage of 325V is housed in a concrete structure in a very humid location. There is service access alsie between rows of batteries. What is the REQUIRED safety distance between the rows of batteries.

 
 
 
 

Q24. Most electric service providers require interactive PV equipment to comply with which for interconnection to their distribution grid?

 
 
 
 

Q25. The point-of-utility connection of a residential utility-interactive PV system is in the main distribution panel. If the busbars of the main distribution panel are rated at 200A, and if the distribution panel has a 200A main breaker, the rated output current of the inverter cannot exceed.

 
 
 
 

Q26. What is an arc-flash boundary?

 
 
 
 

Q27. A technician has been called to a scale due to a low-performing array. The technician will perform tests in the
24-source circuit combiner box. After putting on the correct PPE and turning off and performing lock.tagout of the inverted and combiner disconnect. Which is the next step to safely begin electrical testing in the combiner box?

 
 
 
 

Q28. A grounding electrode is required at the location of all ground-mounted and pole-mounted PV arrays. Which typeof grounding electrode is NOT permitted for arrays. Which type of the grounding electrode is NOT permitted for array grounding?

 
 
 
 

Q29. In the middle of a winter day, the data acquisition system for a ground-mounted PV system with large central inverters sends an email alert that system performance is at 50% based on irradiance and temperature performance calculations. No inverters are completely offline. The closed technician is a 4-hour drive from the site, and there are no cameras on site. Which is the BEST response to this situation?

 
 
 
 

Q30. Which of the following is an NEC-indicate means to identify PV source and output circuits at accessible points of termination connection, and splices?

 
 
 
 

Verified PVIP dumps Q&As – 2024 Latest PVIP Download: https://www.practicematerial.com/PVIP-exam-materials.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below