C-TS422-2022 Questions Prepare with Learning Information! 2024 Regularly updated [Q18-Q40]

4.8/5 - (5 votes)

C-TS422-2022 Questions Prepare with Learning Information! 2024 Regularly updated

Get C-TS422-2022 Products Practice Material for C-TS422-2022 Exam Question Preparation

NO.18 What is the purpose of a reporting point confirmation in repetitive manufacturing?
Note: There are 2 Correct answers to this question?

 
 
 
 

NO.19 Which of the following elements does MRP take into account during net requirement calculation? Note:
There are 2 correct answers to this question.

 
 
 
 

NO.20 What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question

 
 
 
 
 

NO.21 Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.22 in your Plant, MRP is activated.
which options do you have to exclude a material from the MRP run?
Note: there are 2 correct answers to this question.

 
 
 
 

NO.23 Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material?
Note: There are 2 Correct answers to this question?

 
 
 
 

NO.24 In the Capacity Scheduling Table, which settings can you select for the planning strategy?
Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.25 How can you support a GMP (Good Manufacturing Practice)-compliant production process?
Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.26 What is the work center hierarchy in capacity planning?

 
 
 
 

NO.27 Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

 
 
 
 

NO.28 In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

 
 
 
 

NO.29 For a production version to be valid and consistent, what requirements must be fulfilled? Note:There are 3 correct answers to this question.

 
 
 
 
 

NO.30 For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.31 Which master data object governs the relationship between supply source and demand source in the Kanban process?

 
 
 
 

NO.32 What are the options if the Dispatched operation status is set for a production order operation?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.33 Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?

 
 
 
 

NO.34 What can you use heuristics in Advanced Planning (PP/DS) for?

 
 
 
 

NO.35 What is the purpose of a reporting point confirmation in repetitive manufacturing?
Note: There are 2 Correct answers to this question?

 
 
 
 

NO.36 You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

 
 
 
 

NO.37 You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have?
Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.38 You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?

 
 
 
 

NO.39 You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

 
 
 
 

NO.40 What does the material type influence?
Note: There are 2 correct answers to this question.

 
 
 
 

Most Reliable SAP C-TS422-2022 Training Materials: https://www.practicematerial.com/C-TS422-2022-exam-materials.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below