[Nov-2026] CCM Exam Dumps – Free Demo & 365 Day Updates [Q68-Q90]

Rate this post

[Nov-2026] CCM Exam Dumps – Free Demo & 365 Day Updates

Free Sales Ending Soon – Use Real CCM PDF Questions

Medical Professional CCM Exam Syllabus Topics:

Section Weight Objectives
Care Delivery and Reimbursement Methods 31% – Case management concepts, processes, and principles
– Reimbursement pathways and utilization management tools

  • 1. Managed care models and funding sources
  • 2. Government and commercial insurance plans
Ethical, Legal, and Practice Standards 15% – CCMC Code of Professional Conduct parameters
– Regulatory compliance requirements and frameworks

  • 1. Affordable Care Act impacts
  • 2. Patient privacy mandates and HIPAA
Quality and Outcomes Evaluation and Measurements 18% – Caseload calculation metrics and tracking standards
– Quality indicator metrics and performance tools

  • 1. Accreditation standard configurations
  • 2. Cost-benefit analysis algorithms
Psychosocial Concepts and Support Systems 27% – Client dynamics and social determinants of health

  • 1. Cultural competency and spiritual influences
  • 2. Crisis intervention techniques
  • 3. Family and support system evaluation

– Behavioral health conditions and dependencies

Rehabilitation Concepts and Strategies 9% – Vocational and physical rehabilitation pathways

  • 1. Chronic illness and disability support models
  • 2. Assistive device adaptation strategies

– Worker recovery and return-to-work solutions

 

QUESTION 68
The Contractor is entitled to an advance payment. Applying FIDIC Red Book (edition 1999), which two of the following statements are correct?
Choose all of the correct answers (multiple possibilities):

 
 
 
 

QUESTION 69
(In a region experiencing civil unrest and armed conflict under a FIDIC Red Book 1999 Contract, violence escalates into an insurrection, forcing the Contractor to stop work and retreat to a secured compound. The Contractor issues a notice claiming this is an Employer’s Risk under Sub-Clause 17.3 (a) and (b), requesting Extension of Time and Cost. What is the most appropriate position for the Engineer at this stage?)

 
 
 
 

QUESTION 70
If a FIDIC Red, Yellow, or Silver Book (edition 2017) is applied, in which of the following two cases is the Contractor required to submit a revised programme?
Choose all of the correct answers (multiple possibilities).

 
 
 
 

QUESTION 71
Under the FIDIC Red and Yellow Books (edition 1999): if the Engineer gives an instruction which requires the Employer’s prior approval, the Contractor is required to verify whether the Engineer has obtained the Employer’s prior approval or not. Is this statement true or false?

 
 

QUESTION 72
Under the FIDIC Red Book (edition 1999), if the Contractor as per Sub-Clause 14.2 has to ensure the Employer receives an Advance Payment Guarantee as per the standard model, what type of instrument should this be?

 
 
 
 

QUESTION 73
A new important feature of the FIDIC Yellow and Silver Books (edition 2017) is the inclusion of the default position that the Works or relevant part of the Works designed by the Contractor shall be fit for their ordinary purposes. Is this statement true or false?

 
 

QUESTION 74
You are teaching a group of early career professionals in the Contract Management department about the FIDIC 2017 Rainbow Suite of contract, and you are explaining about the intention of Delay Damages. Which one of the following statements is correct?

 
 
 
 

QUESTION 75
The procurement process of a project executed based on any FIDIC Contract model is exactly the same in terms of definitions, time and steps, which makes it universal and more easy to use worldwide. Is this statement true or false?

 
 

QUESTION 76
Under the FIDIC Red Book, which one of the following statements is correct for a claim by the Contractor?

 
 
 
 
 

QUESTION 77
Which two of the following statements are correct regarding Dispute under the FIDIC Red, Yellow, and Silver Books (edition 2017)?
Choose all of the correct answers (multiple possibilities)

 
 
 
 

QUESTION 78
Which of the following form a Contractor’s entitlement, in case the Contractor does not receive an interim payment within the allocated contractual deadline for payment? (2 correct answers apply) Choose all of the correct answers (multiple possibilities).

 
 
 
 
 

QUESTION 79
During the execution of certain Works under a FIDIC Yellow Book (edition 1999), a Contract in a historical area along the silk route, one of the workers on the excavator shouts out to the supervisor of the Contractor it has discovered something on the Site. The supervisor inspects the finding and concludes this is possibly an ancient treasure in a wooden box. The supervisor sees some golden coins through the cracked lid of the box.
The supervisor immediately stops the execution of the Works, sends the workers away and blocks access to the Site for all persons. Given the sensitive nature of the findings, the supervisor informs you as Engineer.
How do you react?

 
 
 
 

QUESTION 80
Under the FIDIC Red Book (edition 2017), if the Contractor fails to comply with Site clearance obligation, what two options does the Employer have?
Choose all of the correct answers (multiple possibilities)

 
 
 
 

QUESTION 81
Under the FIDIC Construction Contract (Red Book), which of the following amendments do NOT comply with the FIDIC Golden Principles? [1999 Edition] (2 correct answers apply) Choose all of the correct answers (multiple possibilities).

 
 
 
 

QUESTION 82
The FIDIC Red Book (edition 1999) deals with Value Engineering Clause. It follows from this clause that the Contractor shall give notice to the Engineer with supporting particulars. Upon receiving this notice, the Engineer shall proceed in accordance with Sub-Clause 3.5 to agree or determine this Cost, which shall be included in the Contract Price.

 
 

QUESTION 83
There are four reasons that the Employer/Contractor shall advise in advance each other and the Engineer of any known or future events or circumstances.
Which two of the following statements are NOT applicable reasons?
(Choose all correct answers – multiple possibilities)

 
 
 
 

QUESTION 84
Which of the following FIDIC contract forms require certification in the payment process? (2 correct answers apply) Choose all of the correct answers (multiple possibilities).

 
 
 

QUESTION 85
(The Employer is a leading company in the hospital and medical care sector who wishes to build a new hospital. The Employer is considering approaching a financial institute to secure most of the funds; therefore, he requires clarity and stability in terms of the Project ‘ s budget and time for completion. Which book do you recommend?)

 
 
 
 

QUESTION 86
Which one of the following statements is NOT correct in respect of FIDIC Yellow Book (both editions)?

 
 
 
 

QUESTION 87
Which one answer holds two statements that are both correct with regards to risks and key considerations regarding the Golden Principles?

 
 
 
 

QUESTION 88
Which one of the following statements is NOT correct in respect of FIDIC Red Book (both editions)?

 
 
 
 

QUESTION 89
The amount of an advance payment guarantee provided for pursuant to FIDIC Red and Yellow Books (both editions) may be reduced as of:

 
 
 
 

QUESTION 90
Under FIDIC Red and Yellow Books (edition 2017), which two of the following elements shall form part of the revised programme?
Choose all of the correct answers (multiple possibilities)

 
 
 
 

CCM Dumps – Pass Your Certification Exam: https://www.practicematerial.com/CCM-exam-materials.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below